Plan: Roadmap to revenue
Written for an AI agent to fetch and follow: it says what to connect, which steps to build with which product, what a person must approve, and how to check the result. Steps that depend on a part that is not built say so, and tell the agent to record the gap instead of guessing.
URL pattern: /use-cases/<id>/openspec.md, all plans at /use-cases/index.json. Checkboxes on this page are for reading only.
Why
The roadmap follows whoever spoke last. Nobody can say which deals wait on which feature, or which deals moved after a feature shipped. It turns a roadmap argument into a list with pipeline next to each item, and it stops shipped work from going untold.
What Changes
- Add the
roadmap-to-revenueworkflow to the PromptReports workflow library, run by the workflow runner as an agent acting for a person. - Sales as Code: Read the capability each deal waits on (today: Built).
- CommitOps: Read those deals into the ledger (today: Switching on).
- CommitOps: Rank capabilities by blocked pipeline (today: Planned).
- RepoOps: Find shipped work per capability (today: Built).
- CommitOps: Report the deals each shipped capability moved (today: Planned).
- PromptCompute: A person approves telling each waiting customer (today: Built).
- Gate
commitops.customer.notify,crm.deal.updatethrough PromptCompute approvals; each gated step runs only afterverifyResumepasses, withfinal_args. - Write a signed record at the end of each run and count one workflow request.
Impact
- Products: Sales as Code, CommitOps, RepoOps.
- Outside the family: HubSpot, Salesforce or Attio, GitHub.
- State: Partly built. Sales as Code deals name the capability they wait on, sent once CommitOps reads them. Two parts to go.
- Plan row: LDG-2273.
1. Connect and authorize
- 1.1 Confirm the org has a connection for each of: Sales as Code, CommitOps, RepoOps. Stop and tell the user which is missing.
- 1.2 Get a PromptReports ID agent token for each product the run calls (RFC 8693 exchange). Where a product does not accept ID tokens yet, use its connect key.
- 1.3 Register policy for
commitops.customer.notify,crm.deal.updatewithrequire_approvalas the default.
2. Build the steps
- 2.1 Sales as Code: Read the capability each deal waits on.
- 2.2 CommitOps: Read those deals into the ledger.
- 2.3 CommitOps: Rank capabilities by blocked pipeline. Blocked: this part is Planned; until it ships, record the step's evidence as
missingand continue. - 2.4 RepoOps: Find shipped work per capability.
- 2.5 CommitOps: Report the deals each shipped capability moved. Blocked: this part is Planned; until it ships, record the step's evidence as
missingand continue. - 2.6 PromptCompute: A person approves telling each waiting customer.
3. Verify and record
- 3.1 Run a dry run with the user's inputs: Pipeline = Open deals this quarter; Capability list = From CommitOps.
- 3.2 Run it once for real; approve each gate as the user.
- 3.3 Measure the outcomes: Open pipeline attached to each capability; Deals that moved within 30 days of the capability shipping; Shipped promises not yet told to the customer: target 0 after 7 days.
- 3.4 Confirm the run left a signed record with a task id and one workflow request counted.
ADDED Requirements
Requirement: Demand is ranked by pipeline
The ranking step SHALL order capabilities by the distinct open pipeline that waits on them.
Scenario: Demand is ranked by pipeline
- WHEN two deals at one company wait on the same capability
- THEN the ranking counts the company's pipeline once
Requirement: Shipped work gets told
The workflow SHALL list each customer whose promised capability shipped and who was not told.
Scenario: Shipped work gets told
- WHEN a capability ships
- THEN shipped_not_told lists its waiting customers, oldest first, for approval
Requirement: Evidence stays honest
Each step SHALL report what it saw as measured, inferred or missing, and SHALL never report missing as measured.
Scenario: A product part is not built
- WHEN a step depends on a part that is Planned or Proposed
- THEN the step records
missing, names the part, and the approval card shows the gap
Requirement: One run is one workflow request
The runner SHALL count one workflow request when the first step starts, and SHALL NOT count retries, resumes or dry runs.
Scenario: A gated step resumes after two days
- WHEN a person approves a step and the run resumes
- THEN the org's usage does not change